Bangalore

Electric Charging Stations in Bangalore

Find EV charging stations near you in Bangalore. Get location details, charger types and operating hours.

Bangalore has 60+ public EV charging stations operated by Tata Power EZ Charge, ChargeZone, Statiq, and Jio-bp Pulse. Stations are concentrated in Andheri, BKC, Powai, Lower Parel, and Navi Mumbai. CCS2 is the most common fast-charging connector and public DC fast charging costs Rs. 15-22 per kWh. A 40 kWh EV charges from 10% to 80% in 60-90 minutes at a 50 kW station.

Bangalore EV Charging at a Glance

60+
EV Stations
public charging points
20+
DC Fast Chargers
30 kW and above
39+
24/7 Stations
always open
6+
Networks
Tata Power, ChargeZone and more
CCS2
Main Connector
most widely supported
Rs. 15-22
Cost per kWh
DC fast charging avg

EV Charging in Bangalore: What You Need to Know

How many public EV charging stations does Bangalore have?

Bangalore has 60+ public EV charging stations spread across major residential, commercial, and transit corridors. The number has grown significantly in 2024-2025, driven by Tata Power, ChargeZone, Statiq, and government-backed network expansions. Most commercial stations are concentrated near malls, IT parks, petrol stations, and highway entry points.

Which charging networks operate in Bangalore?

Bangalore has 6+ registered charging networks. Tata Power EZ Charge has the largest footprint with fast chargers across malls, residential complexes, and petrol stations. ChargeZone, Statiq, and Jio-bp Pulse also operate in the city. Most commercial stations accept payment via the operator app or RFID card, and several locations now support contactless UPI payment.

Is DC fast charging available in Bangalore?

Yes. Bangalore has DC fast charging points (30 kW and above) using the CCS2 standard, which works with all major new EVs including the Tata Nexon EV, Hyundai Creta EV, Mahindra XEV 9e, MG ZS EV, and BYD Atto 3. Fast chargers are concentrated near commercial hubs and highway corridors. A 10%-to-80% fast charge typically takes 55-75 minutes at a 50 kW station.

What does it cost to charge an EV in Bangalore?

Public DC fast charging in Bangalore costs Rs. 15-22 per kWh depending on the network and charger type. For a Tata Nexon EV Max (40.5 kWh battery), a 10%-to-80% charge costs approximately Rs. 430-550 and takes 60-70 minutes. AC slow charging at malls and parking facilities is available at Rs. 8-14 per kWh. Home charging at domestic tariff rates is the most cost-effective option at Rs. 6-9 per kWh.

How does EV charging cost compare to petrol in Bangalore?

Charging a 40 kWh EV battery at a public DC fast charger costs Rs. 600-720 and covers roughly 280-300 km. The equivalent distance in a petrol car at Mumbai prices costs Rs. 1,800-2,100. Even using public fast chargers, EV running costs are 60-65% lower than petrol. At home charging rates, savings exceed 80% per km.

Quick Facts

  • DC fast charge: Rs. 15-22/kWh
  • AC slow charge: Rs. 8-14/kWh
  • Home charge: Rs. 6-9/kWh
  • Most common port: CCS2
  • DC fast charge time: 55-90 min
  • App required: Tata Power / ChargeZone / Statiq
  • FASTag not required for charging

Browse Charging Stations by Network

Browse charging stations by popular brands across India

60 Charging Stations in Bangalore

Find the nearest EV charging station with real-time availability

Electric Vehicle Charging Station

3rd Black Basement Parking No 3G 107 80 Feet Road JP Nagar Phase 8 , Arya Hamsa Apartment
AC - 1 Slot - IEC 60309 (Level 1

Electric - Vehicle Charging Station

No 553 Therant Tower Electric F Block Sahakar Nagar
Closed Opens 10:00 AM
Socket3PIN
AC - 2 Slots - 3PIN-15AMP Socket (Level 1)

BMW - Navnit Motors Charging Station

Survey No 4 Konappana Agrahara Begur Hobli Hosur Road Near Electronic City
Closed Opens 10:00 AM
Socket3PIN
AC - 1 Slot - 3PIN-15AMP Socket (Level 1

Ather - Jayanagar Charging Station

#64, 10th Main Rd, 4th Block, 5th Block, Jayanagar
Open 12:00 AM - 11:59 PM
AC TYPE 2
Slot - 33.5kW

Mahindra - Eva Mall Charging Station

Eva Mall, 60, Brigade Road, Bengaluru, Karnataka, 560025
Closed Opens 10:00 AM
AC PLUG POINTSocket3PINIEC 60309
slots - 6

Mahindra - Sireesh Auto Pvt Ltd Charging Station

Near Grur Bus Stop Jakkur Main Road Opposite to Flying School
Closed Opens 10:00 AM
Socket3PIN
AC - 4 Slots - 3PIN-15AMP Socket (Level 1)

Mahindra - Reva Electric Vehicle Charging Station

Palace Cross Road Chakravarthy Layout Hosakote Bengaluru Rural District
Closed Opens 10:00 AM
Socket3PINIEC 60309AC TYPE 2
AC - 2 Slots - 3PIN-15AMP Socket (Level 1) AC - 2 Slots - IEC 60309 (Level 1)

Ather - AG's Layout, Mathikere Charging Station

No.27, 3rd floor ,Al Josan, New Bel Road, Above Woodland Showroom, AG's Layout, Mathikere, Jaladarsini Layout, Mathikere
Closed Opens 10:00 AM
Bharat AC001
Slot - 33.3 kW

Arya Hamsa Apartment

3rd Black Basement Parking No 3G 107 80 Feet Road JP Nagar Phase 8
Closed Opens 10:00 AM
IEC 60309
AC - 1 Slot - IEC 60309 (Level 1

EV Charging Networks in Bangalore

Major charging operators and their coverage. Each network has its own app for locating stations and paying.

Tata Power EZ Charge
50 kW DC max

Largest EV charging network in India with the widest footprint across malls, petrol stations, residential complexes, and highway corridors.

Key areas: Whitefield, Indiranagar, MG Road, Electronic City
Connectors: CCS2, Type 2, Bharat DC001
App: Tata Power EZ ChargeRs. 17/kWh
ChargeZone
60 kW DC max

Fast-growing network with 60 kW DC chargers at suburban malls, highway access points, and commercial complexes.

Key areas: Koramangala, Marathahalli, Outer Ring Road
Connectors: CCS2, Type 2
App: ChargeZoneRs. 16-22/kWh
Statiq
60 kW DC max

Competitive pricing with chargers at IT parks, highways, and commercial areas. Billing via prepaid app wallet.

Key areas: Whitefield IT parks, ITPL, Manyata Tech Park
Connectors: CCS2, Type 2
App: StatiqRs. 15-18/kWh
Jio-bp Pulse
50 kW DC max

Co-located at Jio-bp petrol stations citywide. Easy to find via Google Maps and supports most EVs via CCS2.

Key areas: Jio-bp petrol stations across Bengaluru
Connectors: CCS2, Type 2
App: Jio-bpRs. 16-20/kWh
MSEDCL
30 kW DC max

Maharashtra government-backed charging infrastructure at MSEDCL offices, public buildings, and open spaces across Greater Mumbai and Navi Mumbai.

Connectors: CCS2, Type 2
App: MSEDCLRs. 15/kWh
Zeon Charging
25 kW DC max

Growing network focused on residential societies and commercial buildings across Maharashtra cities including Mumbai.

Key areas: Residential societies across Bengaluru
Connectors: CCS2, Type 2
App: ZeonRs. 15-18/kWh

Where Can You Charge an EV in Bangalore?

Charger availability by location type across the city.

Location TypeDensityMain NetworksExamples in Bangalore
Shopping MallsHighTata Power, ChargeZoneHigh Street Phoenix, Infiniti Mall, Inorbit
IT ParksHighTata Power, StatiqBKC, Powai, Andheri MIDC
Petrol StationsGrowingJio-bp Pulse, Tata PowerJio-bp and BPCL pumps citywide
HotelsMediumTata Power, ChargeZoneMarriott, Novotel, JW Marriott BKC
Residential SocietiesGrowingTata Power, ZeonGated complexes via society tie-ups
Highway CorridorsGrowingTata Power, ChargeZoneWEH, EEH, Mumbai-Pune Expressway entry

Types of EV Chargers Available

Understanding which charger type works with your EV helps you find the right station quickly.

CCS2

DC

Combined Charging System 2

Speed: 25 kW to 150 kW
Charge time: 30-90 min (10% to 80%)
Compatible EVs: Tata Nexon EV, Hyundai Creta EV, Mahindra XEV 9e, MG ZS EV, BYD Atto 3, Tata Curvv EV, Kia EV6

Most common DC fast charger standard in India. Available at Tata Power, ChargeZone, Statiq, and Jio-bp Pulse.

Type 2 AC

AC

Type 2 (IEC 62196)

Speed: 3.3 kW to 22 kW
Charge time: 4-12 hours
Compatible EVs: All EVs sold in India as the standard AC inlet

Most widely installed connector in India. Used for home charging, overnight hotel charging, workplace points, and mall parking.

Bharat DC001

DC

Bharat DC 001

Speed: Up to 15 kW
Charge time: 60-90 min
Compatible EVs: Tata Tigor EV, older Tata Nexon EV, Mahindra eVerito, older Ather scooters

India-specific standard developed by the Bureau of Energy Efficiency (BEE). Being phased out as CCS2 becomes dominant.

CHAdeMO

DC

CHAdeMO

Speed: Up to 50 kW
Charge time: 30-60 min
Compatible EVs: Nissan Leaf, Kia Soul EV (older models)

Japanese standard, rare in Indian cities. Limited to a small number of Nissan and older Kia dealerships.

Best Areas for EV Charging in Bangalore

Neighbourhoods with the highest concentration of public charging stations.

Whitefield

24+ stations
Networks: Tata Power, Statiq
Key spots: ITPL, VR Bengaluru Mall, Prestige Tech Park

Koramangala

18+ stations
Networks: Tata Power, ChargeZone
Key spots: Forum Mall, 7th Block, 1 MG Road area

Indiranagar

14+ stations
Networks: Tata Power, ChargeZone
Key spots: 100 Feet Road, CMH Road, commercial stretch

Electronic City

16+ stations
Networks: Tata Power, Statiq
Key spots: Infosys campus, Wipro tech park, flyover junction

Marathahalli

12+ stations
Networks: ChargeZone
Key spots: Outer Ring Road, malls near ORR

Hebbal

10+ stations
Networks: Tata Power
Key spots: Esteem Mall, Manyata Tech Park, flyover area

EV Charging by Neighbourhood in Bangalore

Where to find chargers in each part of the city, with named landmarks.

Whitefield

24+ stations
Networks: Tata Power, Statiq
Key spots: ITPL, VR Bengaluru Mall, Prestige Tech Park

Koramangala

18+ stations
Networks: Tata Power, ChargeZone
Key spots: Forum Mall, 7th Block, 1 MG Road area

Indiranagar

14+ stations
Networks: Tata Power, ChargeZone
Key spots: 100 Feet Road, CMH Road, commercial stretch

Electronic City

16+ stations
Networks: Tata Power, Statiq
Key spots: Infosys campus, Wipro tech park, flyover junction

Marathahalli

12+ stations
Networks: ChargeZone
Key spots: Outer Ring Road, malls near ORR

Hebbal

10+ stations
Networks: Tata Power
Key spots: Esteem Mall, Manyata Tech Park, flyover area

Popular EVs and Charging Compatibility

Estimated charge times and costs for the most popular EVs at public DC fast chargers (50 kW).

Charge time = 10% to 80% at 50 kW DC. Cost = Rs. 15-22/kWh at public charger. Actual results vary by temperature, speed, and charger availability.

EV Charging Cost in Bangalore (2025 Rates)

DC Fast Charging: Rs. 15-22 per kWh
AC Slow Charging: Rs. 8-14 per kWh
Home Charging: Rs. 6-9 per kWh
EV ModelBatteryCost (10%-80%)DC Time (50 kW)AC Time (7.2 kW)
Tata Nexon EV Max40.5 kWhRs. 425 - 62434 min4.5 hrs
Tata Punch EV LR35 kWhRs. 368 - 53929 min3.9 hrs
Hyundai Creta EV51.4 kWhRs. 540 - 79243 min5.7 hrs
MG Windsor EV38 kWhRs. 399 - 58532 min4.2 hrs
Mahindra XEV 9e79 kWhRs. 830 - 1,21755 min8.8 hrs
BYD Atto 360.48 kWhRs. 635 - 93151 min6.7 hrs
Tata Curvv EV55 kWhRs. 578 - 84746 min6.1 hrs
Vs petrol: Charging a 40 kWh EV from 10% to 80% at a public DC fast charger costs Rs. 430-550. The equivalent 280-300 km in a petrol car at current Bangalore prices costs Rs. 1,800-2,100. Public fast charging is 60-65% cheaper per km than petrol.

Costs are estimates at Rs. 15-22/kWh. Actual rates vary by operator and location. Charge time assumes 10% to 80% at the stated charger output. AC time assumes 20% to 100% at 7.2 kW.

Quick Facts: EV Charging in Bangalore (2025)

  • Bangalore has 60+ public EV charging stations as of 2025.
  • 20+ DC fast chargers (30 kW and above) operate across the city.
  • Major networks: Tata Power EZ Charge, ChargeZone, Statiq, and Jio-bp Pulse.
  • Most common connector: CCS2 for DC fast charging.
  • DC fast charging cost: Rs. 15-22 per kWh.
  • Charging a 40 kWh EV (10% to 80%) takes 60-90 min at a 50 kW DC charger.
  • Payment: operator app, RFID card, or UPI at select locations.

EV Charging Stations Across India

Find EV charging stations in major cities across India

Frequently Asked Questions

About This Data for Bangalore

Data Sources

  • Station locations: operator-reported data from registered charging networks
  • EV battery specifications: ARAI-certified manufacturer data
  • Charging tariffs: published rates from Tata Power (Rs. 17/kWh), ChargeZone (Rs. 16-22/kWh), Statiq (Rs. 15-18/kWh)
  • Station hours and connector types: verified via operator listings

Methodology

  • Charge time estimates use 10%-to-80% at the stated charger output
  • Cost estimates use Rs. 15-22/kWh range to account for network variation
  • Real-world results vary by temperature, driving speed, and charger availability
  • Station counts are updated periodically; use the operator app for real-time availability
Maintained by the CarBikeGPT editorial team. For real-time availability, use the operator app.Last updated: June 2026